Laurie Sanderson reported the following St. Augustine and St. Johns County locations to Historic City News where the Florida Department of Transportation will be conducting roadwork that is expected to have an impact on driving, beginning this morning and continuing through the coming week.
Downtown St. Augustine: Avenida Menendez and the Bridge of Lions will be closed to motorists from the Castillo de San Marcos to the east end of the Bridge of Lions from 7:30 a.m. to 8:15 a.m. Saturday during the Bridge of Lions 5K event. Motorists may also encounter temporary delays east of the bridge along Gerado Street, Arpieka Avenue, St. Augustine Boulevard, Inlet Drive, Zorayda Avenue, Oglethorpe Boulevard, Comares Avenue, Flagler Boulevard and Alcazar Street. Motorists are advised to use the State Road 312 bridge as an alternate route.
State Road 16: Crews are scheduled to repaint the roadway lines from the Clay County line to US 1. This is a slow moving operation.
State Road 207: Daytime shoulder closures for delivery of equipment and materials to construct a multi-use trail from Armstrong Road to Old State Road 207 in Spuds.
State Road 312: Boaters should be aware that the vertical clearance beneath the bridge is reduced by four feet. The time frame for the vertical clearance reduction has been extended through July 25. Traffic has been shifted on the eastbound lanes of the Mickler-O’Connell Bridge over the Matanzas River. Motorists should use caution while driving in the area as crews repair and repaint the bridge. Pedestrians are advised to avoid the east bridge.
State Road 312: Nighttime lane closures from 8 p.m. to 6 a.m. at US 1 for turn lane construction by St. Johns County. Questions may be directed to Project Manager Greg Caldwell in the St. Johns County Engineering Division at (904) 209-0132 orgcaldwell@sjcfl.us.
State Road A1A: Crews are scheduled to repaint the roadway lines from the Flagler County line to Avenida Menendez. This is a slow moving operation. Also, daytime lane closures while crews repaint the roadway markings.
US 1: Crews are scheduled to repaint the roadway lines from the Flagler County line to State Road 16, excluding the construction zone at the US 1 San Sebastian River Bridge. This is a slow moving operation.
US 1: Nighttime lane closures for southbound traffic from 7:30 p.m. to 6 a.m. at the San Sebastian River Bridge from Saragossa Street to King Street for the bridge replacement project. Traffic has been shifted and the left turn lane removed onto eastbound King Street for southbound US 1 traffic.
Discover more from HISTORIC CITY NEWS
Subscribe to get the latest posts sent to your email.